Quote List
Cart
The Mohamed Bin Rashid Library aims to stand alongside the largest and most famed libraries in the world. Its development includes a 500-seat theatre and is located in Al Jaddaf.
The Library required a 15.5m long truss to be suspended from the auditorium ceiling for the lighting rig. Eurotruss was the client’s top choice for its quality and high safety standards.
Procom Middle East provided the full installation of the truss and rigging material. It consisted of a selection of HD44 of varying sizes and custom made rigging plates that were fixed into the ceiling.
Finally, load testing was performed on each of the components in the system to complete all safety measures
Comments are closed.